Home
About Us
Our Approach
History
Management
Awards
Our Divisions
Mechanical Oil and Gas Division
Electrical Division
Civil Division (Industrial and Buildings)
Marine Division
Projects
Resources
Vendors
News and Highlights
Contact Us
OAG 1 Project
Client: ADNOC LNG
Lead Division:
Mechanical Oil and Gas Division
Client:
ADNOC LNG
Location:
Das Island, Abu Dhabi
Start Year:
2012
Project Status:
Completed
Completion Year:
2013
Above ground piping work, prefabrication and Erection, and painting works.
Back to Projects
Related Projects
Green Diesel Project
Jebel Dhanna Tank Farm Facilities Upgrade
EPC Works for Paraffinic Naphtha Tanks Replacement Project
Engineering, Procurement, Construction, Commissioning and Start up of Sea Water Intake – 3 (SWI-3), Ruwais
Structural , Mechanical and Piping Works (East Area)
Steel Structure, Equipment Installation and Piping Work in SMP 05 area for Ruwais Refinery Expansion Project, Ruwais
Nitrogen Gas Injection (Pure Gas) Project, Habshan Abu Dhabi
Carbon Area General Mechanical Installation
Mechanical Engineering, Procurement, and Construction of Compressed Air Piping System
Carbon Mechanical Installation
Sewage Treatment Plant
Dabbiya and Rumaitha Vapour Recovery Units - Pipe Replacement, Clean/ Inspect Coolers and Ancillaries
Revamping Works - Civil, Steel Supply and Erection, Mechanical, Insulation, Painting, Electrical and Instrumentation
ADGAS - Upgrade of Filtration System for AGRU's in Trains 1,2 & 3
Khafji to Tanajib Sour Gas Handling and Compression-Tanajib Plant.
EPC for Causeway Pipelines Project, Mubaraz Island, Abu Dhabi, UAE
EPC works for PE-3 Revamp Project, Ruwais, Abu Dhabi
Expand Liquefied Petroleum Gas Production Facilities at Yanbu Refinery
Reduce Sales Gas Water Content at Uthmaniyah Gas Plant and Shedgum Gas Plant
Hail Surface Facilities Project, Mubarraz and Hail Island, Abu Dhabi, UAE
Closed Drain System at Abqiq Plant
Structural Steel, Mechanical & Piping Installation No. 002 (SMP-2), Al Taweelah Alumina, Abu Dhabi
Mechanical works for Greenfield Package B, Jebel Ali Refinery Expansion Project
Integrated Gas Development Expansion Phase II (IGD-E2) project
Bu Hasa Integrated Field Development Project
Upgrade of Produced Water Disposal Facility at Qatif's GOSP-1
EPC Works for Replacement of Slug Catcher In Zirku Island
Replacement of Storage Tanks at Ras Tanura Refinery
Crude Receiving Facilities at Jebel Dhanna Terminal (JDT)
EPC works for Interconnection of Firewater Network (UZ & SARB Plants), Zirku Island
Mitigation Measures for Off-spec. Condensate Product issue in 18” MCL at CTU at Das Island
BOROUGE 4 (B4) Project- Ethane Cracker
EPC for Surface Facility Hail Oil Field Water Injection project
EPC Works for Phase-III Boat Landing Replacement Project at Upper Zakum
EPC FOR SAHIL PHASE 3 DEVELOPMENT
EPC Work For Umm Lulu Accelerated Growth Project
EPC for Oily Water Treatment Plant Upgrade & Instrument Air Network Upgrade at Zirku Island.